Skip to main content

Electrical Certificate of Compliance for New Builds: Planning, Testing and Handover

Guide Type: Technical guide

01 September 2026
Electrical Certificate of Compliance for New Builds: Planning, Testing and Handover— Illustrative diagram

Understand electrical planning and Certificate of Compliance requirements for a new South African home: contractor registration, testing, documentation and handover.

Quick answer

Electrical work must be planned with the final load schedule and carried out through the required competent, registered process. Early allowances should include the distribution board, circuits, points, connection requirements, testing, documentation and final handover—not just visible plugs and lights.

How to compare the options

OptionBest suited toInclude in the allowance
New electrical installation A complete new-build electrical design and installation. Supply coordination, board, circuits, points, earthing, testing and documentation.
Additions or alterations Extensions or upgrades that interact with an existing installation. Assessment, capacity, new work, certification and reinstatement.

Cost and planning checklist

  • Confirm appliance, hot-water, HVAC, solar and backup loads before final board sizing.
  • Use an appropriately registered contractor and retain all documents.
  • Coordinate conduit and point positions before walls and ceilings are closed.

Use the estimator

Build an early, region-aware allowance in the Price Your Build free estimator. It is a feasibility tool, not a supplier quotation, final design or professional certification.

Related Building Glossary guides

Frequently asked questions

Who may issue a Certificate of Compliance?

The relevant registered person issues it after the required inspection and testing process.

Can a CoC be treated as an optional extra?

No. Include the appropriate testing, documentation and handover in the project scope.

Important

Confirm the final product, scope, installation method, drawings, approvals and professional requirements for the specific site before committing to work.

Source to check

Electrical Installation Regulations and CoC information: www.gov.za/news/media-statements/employment-and-labour-electrical-installation-laws-and-certificate-compliance